We were recently asked to price up domestic electrical work in Cardiff following an EICR carried out by another electrician. When we reviewed the report, one detail stood out immediately: the electrician had been on site for less than one hour.

A domestic Electrical Installation Condition Report, carried out properly, takes between two and four hours depending on the size of the property and the age of the installation. In under an hour, it is not possible to complete all the tests the certificate implies have been done. Somewhere, corners have been cut.

What does a thorough EICR involve?

An EICR is not a visual inspection with a certificate at the end. It is a formal test of an electrical installation against the requirements of BS 7671, the UK wiring regulations. A competent inspection includes:

  • Continuity testing of all protective conductors and bonding.
  • Insulation resistance testing of all circuits.
  • Polarity checks at the consumer unit and at accessories.
  • Earth fault loop impedance testing.
  • RCD testing under load, verifying both the trip current and the trip time.
  • Visual inspection of the consumer unit, accessories, and any visible wiring.

Each of these takes time. RCD testing alone — done properly, at each protected circuit — adds up quickly. Insulation resistance testing requires circuits to be isolated. These are not things that happen during a brisk walk around a house.

Why main bonding is one of the most commonly skipped tests

Main bonding connects the metallic pipework in your home — gas and water — to the earth terminal in your consumer unit. Its purpose is to ensure that, in the event of an electrical fault, there is a low-resistance path to earth that prevents exposed metalwork from becoming live.

Electricity meter and consumer unit boxed in behind kitchen cabinets
The Electric Meter And Consumer Unit Had Been Covered By A New Kitchen Cupboard. The Only Way To Access It For Inspection & Testing And Replacement Was To Remove The Cabinet.

A visual check — confirming that a cable is present and appears to be connected at both ends — is not a test. It tells you that a cable exists. It tells you nothing about whether that cable is actually providing a functional earth path.

The correct method is to disconnect both ends of the main bonding conductor: one end from the main earthing terminal in the consumer unit, and the other from the bonding clamp at the water or gas intake. With both ends free, a multifunction tester is used to measure the resistance of the conductor.

This takes time. It involves working at the consumer unit, locating the intake points (which in older properties can be awkward to access), and making good the connections afterwards. It is easy to skip. And because the cable looks fine visually, the skip is not obvious to the homeowner.

What can go wrong if main bonding is not properly tested?

Corrosion inside the conductor, a loose or corroded clamp, a break in the wire hidden within the insulation — none of these are visible from the outside. All of them result in a bonding conductor that has failed its purpose while appearing perfectly intact.

main-bonding-being-tested

If a fault occurs on a circuit that contacts the pipework — a washing machine with a wiring fault, a boiler with a damaged element — and the bonding is not functional, that fault current has no safe path to earth. Metalwork that should be safe to touch becomes energised. That is the scenario bonding exists to prevent.

How to tell if your EICR was done properly

There are a few straightforward indicators:

  • Time on site. A single-storey two-bedroom property should take at least two hours. Larger or older properties take longer. If your electrician was in and out in under an hour, the inspection was not complete.
  • The certificate itself. A properly completed EICR will include test results — measured values for loop impedance, insulation resistance, RCD trip times. If the report contains only visual observations and tick boxes, it is not a full inspection.
  • What was disconnected. A proper inspection requires isolating circuits for insulation testing, and disconnecting bonding conductors for continuity testing. If nothing was switched off and nothing was disconnected, the tests were not done.

If you have an EICR and you are unsure what went into it, we are happy to review it and advise. If you need a full inspection you can rely on, we carry those out across Cardiff and the surrounding area.

Book a thorough EICR in Cardiff with Gabe Electrical

We carry out complete, properly timed EICRs with full test documentation — the kind that actually reflects the condition of your installation. If you’ve had an inspection recently and something doesn’t feel right, or if you’re buying or letting a property and need a report you can stand behind, get in touch.